Elenor System LLP

Turnkey Projects

BUSINESS OVERVIEW

STEP 1:
STEP 1:

Consultancy

  1. Technical Layout
  2. Advice of location/elevation
  3. Data sheet preparation
  4. Heat and mass balance with heat load calculation
  5. Design and size valves, equipment and flow circuits
STEP 2:
STEP 2:

Engineering

  1. Basic Engineering
  2. Detailed Engineering
STEP 3:
STEP 3:

Planning

  1. Assign priority
  2. Project planning within time frame
  3. Manpower management
STEP 4:
STEP 4:

Procurement

  1. Experience for Quality products
  2. Purchase Planning
  3. Negotiation and delivery schedule optimization
STEP 5:
STEP 5:

Erection

  1. Team of experienced contractors
  2. Fast and adoptive working environment
STEP 6:
STEP 6:

Commissioning

  1. Experienced in handling government bodies
  2. Knowledge in handling boilers and pipeline testing

BOILERs and heaters with Balance Of Plant work

  • Design and supply IBR/ NIBR Steam boilers as per flow, pressure and temp. requirements of any fuel.
  • Layout planning and support for foundation preparation for all boiler and BOP items.
  • Alignment and erection work for main boiler drum shell, furnace, membrane panel, APH, FD fan, ID fan, primary air and flue gas ducting, feed water pumps, control panels and boiler mounted Instruments.
  • All support Structure with ladder and railing work.
  • Design supply and erection for Feed water, drain, vent piping with valves and accessories
  • Complete erection and commissioning for entire boiler house as per IBR guideline.

Steam boilers

Thermic fluid heaters

Pressurised Hot water generators

  • Design and supply for Thermic fluid heaters (TFH) or pressurised hot water generators (HWG -also upto 220°C) as per heat load and temperature requirements of any fuel (Solid, Liquid, Gas or Electric any type).
  • Layout planning and support for foundation preparation for all big items.
  • Alignment and erection work for main pressure part (membrane type or coil design), furnace, APH,WPH or TFPH, FD fan, ID fan, primary air and flue gas ducting, spark aerator, cyclomax, thermic oil pumps, control panels and heater mounted all Instruments.
  • Supply and Erection for Thermic fluid heater inlet/outlet piping, Safety valves, orifice flow with heat meter assembly, main unit pumping area with BSV, basket filters, Expansion bellows and NRVs.
  • Electrical cabling work for all drives, panels, Instruments and main pumps.
  • All MS support Structure with ladder and railing work.
  • Design, supply and erection for Expansion tanks, deaerator tanks, cooler vessels, main unit flow balancing control valve circuits with BSV and Safety valves.
  • Refectory laying work.
  • Main shell coil assembly insulation supply with laying work.

CLEAN ENVIRONMENTS

Wet Scrubber

  • Customise Tower or Venturi Design
  • In-House Development & Manufacturing from various material like MS or SS304 with SS316 nozzles for water spray.
  • Water circulation with chemical dozing pumps with electrical panel
  • Versatile Technologies considering chevron blades, mesh pads and cyclonic separator.
  • Reliable Supply & Support

Bag Filter

  • High-Temp Media & Custom Design considering filter bags of woven fibbers Glass with Acid Resistant & SGT Finish.
  • Efficient Capture & Quality Supply
  • Durable Build & Expert Erection on site
  • Optimized Flow & Seamless Integration
  • Emission Compliance below government norms & Reliable Support

Cyclone Separators

  • High Separation Efficiency
  • Low Maintenance
  • Cost-Effective
  • Versatile

Electrostatic Precipitators (ESP)

  • Offer customised design based on heating equipment capacity
  • Stringent particulate emission standards as prescribed by local pollution control board
  • Undertake complete assembly and site erection of equipment plus integrating with main heating utility.

CLEAN ENVIRONMENTS

Wet Scrubber

Customise Tower or Venturi Design

In-House Development & Manufacturing from various material like MS or SS304 with SS316 nozzles for water spray.

Water circulation with chemical dozing pumps with electrical panel

Versatile Technologies considering chevron blades, mesh pads and cyclonic separator.

Reliable Supply & Support

Bag Filter
  • High-Temp Media & Custom Design considering filter bags of woven fibbers Glass with Acid Resistant & SGT Finish.
  • Efficient Capture & Quality Supply
  • Durable Build & Expert Erection on site
  • Optimized Flow & Seamless Integration
  • Emission Compliance below government norms & Reliable Support
Cyclone Separators
  • High Separation Efficiency
  • Low Maintenance
  • Cost-Effective
  • Versatile
Electrostatic Precipitators (ESP)​
  • Offer customised design based on heating equipment capacity
  • Stringent particulate emission standards as prescribed by local pollution control board
  • Undertake complete assembly and site erection of equipment plus integrating with main heating utility.

TURNKEY PROJECTS

End to End Project Solution

  • Boiler & Thermic Fluid Heater House projects right from unloading of the unit.
  • complete erection including accessories like chimney, tanks, structures, piping, interconnecting ducting, electrical cabling, insulation & IBR formalities.

Piping with Valves, fittings and control valves

  • Various valves with related accessories from part of interconnected piping
  • Design and Undertake these entire utility piping works to connect the process machinery to the heating house.
Scroll to Top